Days to produce month-end WIP
Shows reduced manual assembly and a faster close.
For a general contractor, the numbers that matter are well known: backlog, bid hit rate, gross margin by job, over and under billings, cash position, and fade between estimate and actual. The problem is timing. The WIP schedule gets built once a month in Excel from accounting and Procore exports, and by the time it is reviewed, the month is already gone.
A scoped dashboard project would pull those numbers automatically into a tool like Power BI, refreshed weekly or daily, with a short list of exceptions instead of 40 spreadsheet tabs. PMs see their jobs, owners see the portfolio, and the controller still owns the definitions and signs off on month-end WIP.
The owner, controller and senior PMs agree how percent complete, committed cost, projected margin and backlog are calculated, and write those definitions down.
Accounting, project management and estimating data are pulled on a schedule into one model, with a refresh log so everyone knows how current it is.
A portfolio view for owners, a job view for each PM and a pipeline view for estimating and business development, each fitting on one page.
Jobs where projected margin drops more than a set amount, billings drift from cost, or committed cost exceeds budget are listed at the top.
A 30-minute weekly review walks through exceptions only. Usage is checked after 60 days, and views nobody opens are removed.
How we deliver this: AI automation for small business or fractional CTO leadership, scoped in writing and run over 90 days. See pricing or the sample scope.
Shows reduced manual assembly and a faster close.
The core business measure; the aim is earlier visibility, not fewer problems on paper.
A dashboard nobody opens is just a cost. Usage tells you if it is helping.
Across closed jobs, this shows whether projections are getting more honest.
For example, a GC with 20 active jobs sets a rule to flag any job whose projected margin drops more than two points in a month. Early on a tilt-up warehouse job, the dashboard flags rising concrete labor cost. The PM finds a crew productivity issue and a pending change order that was never priced. Both are addressed while the job is 40 percent complete. Illustrative only, not a projected result.
We would sit with the controller through one month-end close, list every export and spreadsheet used, and agree on the five or six numbers leadership actually reviews. The pilot builds those for active jobs only, measured against the time the manual process takes today.
It might be. Sage, Foundation and similar systems produce WIP reports, and if yours is trusted and timely, a dashboard may add little. The common problem is that the data feeding it is late or inconsistent. We would check that first, because cleaner inputs sometimes solve it without a new tool.
Sureties and banks generally want WIP schedules and financial statements in their usual formats, prepared by your controller or CPA. The dashboard supports internal management decisions; the formal reports still come from your accounting process.
As current as the inputs. If hours post daily and invoices are coded within a few days, weekly views are realistic. Committed costs update as quickly as PMs enter them in Procore. We would show a last-refreshed date on every view so nobody is misled.
Illustrative defaults for a general contractor. Replace them with your numbers.
a month in staff time, before any lost sales
Illustration only, not a forecast or guarantee. Recovered staff time becomes a cash saving only if spending actually declines or the time goes into paid work. Tool costs are an assumption; we replace every number here with yours before recommending a scope.
KPI and pipeline dashboards: full guide
In 30 minutes we look at one recurring workflow, what it costs you today and whether there is a credible case to improve it. If there is not, we will say so.
30 minutes with Phil or Martin. No technical brief, no pitch deck. Phil or Martin replies personally, usually within one business day.