Duplicate data entry hours per week
The most direct cost of disconnected systems.
Most GCs run at least four systems that should share data: estimating, project management in Procore or Buildertrend, accounting in Sage, Foundation or QuickBooks, and field time tracking. In practice, someone exports and re-imports between them. Jobs get created twice, cost codes drift apart, and commitments in Procore never quite match what accounting shows at month end.
Integration work starts with deciding which system owns each piece of data: jobs, cost codes, vendors, commitments, change orders and hours. Then we connect them using native integrations where they exist, and middleware like Zapier, Make or a small custom service where they do not. Sometimes the honest answer is fixing setup, not adding software.
We document which system is the source of truth for jobs, cost codes, vendors, commitments, change orders and hours, and agree it with the PMs and controller.
One cost code structure is applied across estimating, project management, timekeeping and accounting, with a short cleanup of legacy and duplicate codes.
Many construction tools offer direct connectors to common accounting systems. We configure and test those properly before building anything custom.
Where no connector exists, Zapier, Make or a small script moves the specific records needed, with error alerts sent to a named person.
A weekly check compares key totals between systems and lists differences, so drift is caught early rather than discovered at month end.
How we deliver this: AI automation for small business or fractional CTO leadership, scoped in writing and run over 90 days. See pricing or the sample scope.
The most direct cost of disconnected systems.
Tells you whether the integration is healthy and who needs to fix what.
Clean data flow should shorten the close noticeably.
The trust measure: when it falls, job cost meetings stop being reconciliations.
For example, a 60-person GC finds that approved change orders in Procore take about three weeks to reach the accounting budget, because the controller rekeys them in batches. Over a quarter, that lag makes several jobs look over budget when they are not. After mapping ownership and properly setting up the existing connector, change orders flow within a day and the weekly reconciliation shows two remaining mismatches to fix. Figures are illustrative.
In the first 30 days we would draw the current flow of jobs, cost codes, commitments and hours between your systems, and measure the hours spent on double entry. Then we pick the single most painful connection, often change orders or field time, and agree how success will be checked.
Sometimes that is right, especially for smaller contractors with simpler jobs. For others, switching costs and retraining outweigh the benefit. We would compare integrating what you have against moving to a single platform, including the disruption, and make a written recommendation.
They do break, usually after a software update or a renamed field. Each connection we set up has an alert to a named person and a short runbook explaining what to check. Part of the 90 days is making sure your team can handle common failures without us.
Usually not. Most construction integrations are configuration and middleware. If a custom piece is needed, it is scoped and budgeted separately, documented, and built so that another developer could maintain it later. You own the code and the accounts it runs under.
Illustrative defaults for a general contractor. Replace them with your numbers.
a month in staff time, before any lost sales
Illustration only, not a forecast or guarantee. Recovered staff time becomes a cash saving only if spending actually declines or the time goes into paid work. Tool costs are an assumption; we replace every number here with yours before recommending a scope.
Systems integration: full guide
In 30 minutes we look at one recurring workflow, what it costs you today and whether there is a credible case to improve it. If there is not, we will say so.
30 minutes with Phil or Martin. No technical brief, no pitch deck. Phil or Martin replies personally, usually within one business day.